Baby's room Pictures - June
29th, 2003. Installed Sub flooring |
|
Back left hand side. Here's the finished sub flooring. The rug contractor will be by Wednesday to measure. Carpet should be installed by next week! |
|
Right back wall.
|
|
Front left wall. | |
Front right wall. | |
Closet and heater vent |
|