Baby's room Pictures - March 22st, 2003.
(click on any picture to see a larger image)

More drywall

Wall between the two rooms, all set to go. Vent moved to the floor and the switch box for the other room is fixed (it was falling into the wall).
Laura measures for the outlet box cut-out.
Right front wall. Almost done! We still have to drywall the inside of the eave, one of the few things that's left.
Left back wall. Again, the inside of the eave needs to be completed.
Right back wall.
Left front wall - Laura was working here earlier. Door to the left goes into the next room, door on the right goes into the hall.
Finished the outside of the closet too.
Window facing to into the backyard. Just a few small pieces around the window to be completed.

Diva didn't help at all - preferred to sit in the sun.

 

We should be able to finish the drywall tomorrow and might begin the spackle tape.

   